Case Study 1: Kingston Dock, Port Glasgow

MCL installed large diameter concrete drainage with a new outfall built into the existing sea defence system at Kingston Dock, Port Glasgow. These works required extensive deep excavations, temporary works and close liaison with Clydeport.

Read more >


Case Study 2 Image

Case Study 2: Caerlaverock, Dumfriesshire

MCL upgraded existing walkways and footpaths throughout the Caerlaverock estate.

Read more >


Case Study 3 Image

Case Study 3: Auchenlosh, Dalbeattie

MCL constructed a phase of the waste disposal site at Auchenlosh.

Read more >


Case Study 4 Image

Case Study 4: Forestry Works

MCL’s held 3 year framework agreement to carryout mounding works on 1300 hectares of forest plantations in Dumfries District and 90 hectares on the Isle of Arran. Works included creating forestry paths and access provisions.