Environmental: Case Study 1

Case Study 1

What?

Drainage & Outfall, Kingston Dock, Port Glasgow

For Whom?

Clydeport Properties

Value:

£130,000

Timescale:

N/A

Job Description:

MCL installed large diameter concrete drainage with a new outfall built into the existing sea defence system at Kingston Dock, Port Glasgow. These works required extensive deep excavations, temporary works and close liaison with Clydeport.