Industrial: Case Study 2

Industrial Case Study 2

Case Study 2

What?

Concrete Pavement, Grangemouth Docks

For Whom?

Forth Ports

Value:

£875,000

Timescale:

12 weeks

Job Description:

MCL undertook the refurbishment of a large concrete pavement construction at Grangemouth Docks. The project required a high spec structural concrete slab installed to fine tolerances and finishes to ensure low maintenance in a heavily utilised container storage area.