Industrial: Case Study 2

Industrial Case Study 2

Case Study 2


Concrete Pavement, Grangemouth Docks

For Whom?

Forth Ports




12 weeks

Job Description:

MCL undertook the refurbishment of a large concrete pavement construction at Grangemouth Docks. The project required a high spec structural concrete slab installed to fine tolerances and finishes to ensure low maintenance in a heavily utilised container storage area.